RM175.00
In stock
Delivery using J&T. The cost depends on the rate as provided by J&T.
Not refundable due to human error (like scratching); else for the books that printing error, missing pages or incorrect books. Please email us at sales@abookstore.my
1 Introduction
2 Process control
3 Why design work is difficult to plan and monitor
4 Basics of planning and monitoring
5 Feasibility and outline design
6 Integrated planning of design and construction
7 Detail design and design for production
8 Resources and productivity
9 Implementation